Journal of Chemical and Pharmaceutical Research (ISSN : 0975-7384)

header
Reach Us reach to JOCPR whatsapp-JOCPR +44 1625708989
All submissions of the EM system will be redirected to Online Manuscript Submission System. Authors are requested to submit articles directly to Online Manuscript Submission System of respective journal.

Original Articles: 2014 Vol: 6 Issue: 6

Safety evaluation of Matitan reservoir dam

Abstract

Safety evaluation of dams has importance in accessing their functioning. This essay carries out safety evaluation on the basis of Matitan Reservoir Project. Through analysis and recomputation, evaluation of project quality is A; operation management, B; safety of flood-prevention, C; safety of dam construction, A; vadose safety of the dam, B; metal structure, C. Analysis by synthesis, Matitan Reservoir Dam is graded as Band 3. At the end of the essay, the author offers some suggestion in reinforcement

http://sacs17.amberton.edu/

rtp slot demo