Original Articles: 2014 Vol: 6 Issue: 7

Engineering construction project site logistics management

Abstract

The engineering construction project logistics management is the plan, the organization, coordinated and the control carries on to the logistics activity, from the function angle minute, may divide into the engineering construction project physical distribution the supply physical distribution and the scene physical distribution, through the analysis engineering construction project physical distribution's characteristic, elaborated with emphasis the scene physical distribution's key question is the information flow optimizes, the plan to formulate and to control, the scene arrangement, the owner, the design business and contractor's tertiary role, has carried on the preliminary discussion to it. And proposed that the establishment special physical distribution management group management engineering items of basic construction physical distribution, guarantees the physical distribution effective operation. Finally, it distinguishes the key responsibility of logistics management owners, designers, main contractors and specialist contractors and manufacturers, suppliers and vendors.